Almost "Dry In" (the last of the roof panels)
|
|
|
|
Day 13, Walking the steel before the cement arrives
|
|
|
|
First day of REAL construction
|
|
|
|
ABC's Bob Turner
|
|
|
|
Pat O'Day checking out the structural fill dirt & steel deliveries
|
|
|
|
|
Bring on the cement
|
|
|
|
The first pour
|
|
|
|
Add a lot of steel
|
|
|
|
West & South walls in place
|
|
|
|
The East wall was 3rd
|
|
|
|
|
Suspended ceiling tile frame work..getting it level
|
|
|
|
Add some ventilation
|
|
|
|
Dan was always first at the job!
|
|
|
|
Water break for TDI guys
|
|
|
|
Eagle Scouts preparing the pantry shelving
|
|
|
|
|
Jim & Chuck make the cabinets
|
|
|
|
Six days for flooring installation, just love it!
|
|
|
|
Those ceiling tiles are HEAVY!
|
|
|
|
Big Ted building the Aqua Duct system "Hita style"
|
|
|
|
Vernon, the "2" goes at the end!
|
|
|
|
|
Final Inspection is TOMORROW!!
|
|
|