Almost "Dry In" (the last of the roof panels)

Day 13, Walking the steel before the cement arrives

First day of REAL construction

ABC's Bob Turner

Pat O'Day checking out the structural fill dirt & steel deliveries

Bring on the cement

The first pour

Add a lot of steel

West & South walls in place

The East wall was 3rd

Suspended ceiling tile frame work..getting it level

Add some ventilation

Dan was always first at the job!

Water break for TDI guys

Eagle Scouts preparing the pantry shelving

Jim & Chuck make the cabinets

Six days for flooring installation, just love it!

Those ceiling tiles are HEAVY!

Big Ted building the Aqua Duct system "Hita style"

Vernon, the "2" goes at the end!

Final Inspection is TOMORROW!!